The steel roof is on! Still needs a trim on the S side and the eavestrough to carry water to the sides and not into the building when the roof rolls back but one more step! Tomorrow I’ll mount the motor to automate the rollback, work on the interior, and save the ladder stuff for the weekend! Lots more screws to put in as well.